about the project

Client: Consultant Tabec

Introduction

Consultant Tabec, a prominent land developer, contracted Perth Underground Power to undertake a pivotal project within the Atlantis Beach estate at Two Rocks, focusing on Stage 4B. The project aimed to develop and install a complete underground power infrastructure along with an NBN pit and pipe system for a Greenfield development of 22 residential lots. This initiative was crucial for setting the stage for a modern, connected community in the burgeoning area of Two Rocks.

Challenge

With a budget of $120,000, the project required the expertise of our team in effectively planning, developing and installing the power infrastructure and NBN infrastructure. The scope encompassed the installation of Western Power cables and assets, along with a comprehensive NBN pit and pipe network. The primary challenge was to ensure a reliable and efficient power supply to all residential lots while integrating seamless NBN connectivity, all within a strict four-month timeline.

Stage 4B Development

Location Butterfly Street & Rainbow Parkway, Two Rocks
Land Size
Service Complete underground power infrastructure, NBN Pit & Pipe Installation
Project Status Completed

Project Outcomes

Solution

Drawing on our extensive experience in greenfield underground electrical infrastructure development, our team proposed a tailored solution. Utilising an array of assets including excavators, crane trucks, and crane borers, the team meticulously planned, developed and executed the installation of the underground power system and NBN infrastructure. Their approach was grounded in expert advice and a deep understanding of the specific needs and challenges of Greenfield developments.

Results

The Atlantis Beach – Stage 4B project was successfully completed onsite, efficiently and effectively powering the 22 residential lots and ensuring seamless NBN connectivity. The team’s ability to navigate and swiftly overcome various challenges throughout the project was key to the efficient and effective handover of the site’s power and communication infrastructure.

Conclusion

The successful completion of the Stage 4B development at Two Rocks Atlantis Beach stands as good example of Perth Underground Power’s teamwork and expert execution. The project’s outcome in meeting a tight deadline and ensuring a solid and dependable infrastructure, paves the way for a flourishing community in Atlantis Beach. It guarantees that the residents will benefit from superior living conditions, enhanced by cutting-edge electrical and telecommunications systems.